Hello

I am able to see the breakdown analysis report MCI7 for certain equipments only and not for all. I had checked the settings in equipment master (IE03), it appears to be same for all the equipments. The validity date is maintained properly,

Are there any other check points??

Thanks.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Thank you

former_member654170
Contributor
0 Kudos

Hi AR1,

According to Calculation u hv to Maintain Start Date of the Every Equipment or u hv to hv at least 2 breakdowns(Notification with breakdown tick and Malfunction Start and Malfunction End Metion).

If all above correct confirm the Notifications generated date are in sysnchro with ur update frequecy of S70, if not wait u wll get updated MMTR of Equipment with specified ferquency.

naren

Former Member
0 Kudos

Hi Naren,

Thanks for the reply. If i choose to maintain S070 period as day then what will be the impact?h Now it is month.

Also is there any other report otherthan MCI7 to check B/D and damage analysis. In MCI7 the key field selection is limited.

Thanks

former_member654170
Contributor
0 Kudos

Hi ,

Dont do that , i m not sure but it wll loose all information as it is change in infostructure.

If more than 1 companies are running on the server , dont do that , Month is optimum.

Naren

Former Member
0 Kudos

OK

Is threre any other report than MCI7?

Thanks

former_member654170
Contributor
0 Kudos

Yes u can also get MTTR in MCI4