Dear Experts,
After the system copy, I found out that the technical system XI WAS ABAP is linked with the old XI WAS JAVA, the new and correct XI WAS JAVA already exist and linked to XI WAS ABAP, but somehow the XI WAS ABAP was not able to recognize the correct XI WAS JAVA.
Please advice if this issue can be resolved by delete the existing XI WAS ABAP+JAVA and create the new one, or do I have to make any changes on the configuration?
Thanks in advance, your help is truly appreciated.