Hi All,
After run the MRP , for the material which is procured.
in the MRP list , it gave the POitem for the material. and system show the mage
15- schedule out. for the material.and after that we need to go to change the
particular po item for rescheduling mannually.
can system do the rescheduling instead of manual work