Hi Guys,
During rework production order confirmation system giving error message as below:
[Item category 01001 not allowed in accounting transaction 0000/0001
Message no. GLT2001
Diagnosis
The online document splitting is active in your system. Here, each document is assigned to a accounting transaction variant and each document row to an item category. You determine for each business transaction variant which item categories can or must be posted here.
The following error occurred for the document you entered:
Item category 01001 in accounting transaction 0000, variant 0001 is no allowed.
System Response
The document cannot be posted.
Procedure
Check the document entered, the derivation of the business transaction variant, the derivation of the item category, and the assignment of the item categories to the business transaction variant.
Procedure for System Administration]
This error relating to New G/L split functionality such as the document type and G/L accounts document type. Doc type is using as same as normal production order and normal production order confirmations and other activities are posted successfully. Iu2019m in a puzzle, regards to this behavior of rework order?
Back ground for rework order:
Rework order was created through trigger points.
Rework order doesn't have any material, it has to pick and settle to original production order; the same was defined at re-work order settlement.
Rework order not doing any cost calculations at production order level itu2019s giving a message as below:
Object was not costed
Message no. CK060
Diagnosis
The system could not find any entries that are relevant to costing.
System Response
The system did not cost the object.
Procedure
Check whether the following objects should be flagged as relevant to costing:
- Items in the BOM
- Display BOM
- Operations in the routing
- Control key in the routing
1. Look at the message log.
2. Check whether a quantity was specified in the confirmation.
Will some one throw some light to come out from this situation and what I missed out and what need to be maintained exactly Plz.
Thanks in advanceu2026Vyas