Skip to Content

Question regarding Material staging for PP EWM integration

Hi All,

I am working on PP EWM integration for my client. I am using all EWM managed slocs i.e. sloc IN01----ROD, IN02---AFS, IN08---prod order consumption sloc (PSA).

When I stage component materials (only pick parts) from IN02 to IN08, for a production order, I want to ensure that only the production order for which material staging is done should be able to consume it.

In other words if there are multiple open production orders and for some of the production orders if staging is not done then such production should not be able to consume materials (staged for other production orders) when confirmation is getting posted in CO11N or CO15. (backflush for components already activated in the material master)

In std PP WM integration; system creates a dynamic bin with the number same as production order no, however no such thing is there in EWM integration, so can anybody please help me to understand how I can segregate stocks of different production orders staged and ensure consumption only for the order for which staging is done?

thanks,

Ritesh

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

0 Answers