Hi All,
I am running a demo for Project Manufacturing which is based on Integration of SAP R/3 PS and SAP APO. I've very less know-how of APO and hence I'm facing trouble running the Demo. I would request you to guide me with the details and right path.
The details of the demo process are:-
Step1: Adjust required overlaod for a dummy project (ERP)
- In this step, we open project builder (CJ20n) and choose a dummy project and ensure that there are no successor relationships between two activities.
Step2: Schedule dummy project to adjust requirement dates for blocked capacity (ERP)
-In this step, we open project builder (CJ20n) and choose the dummy project and do date adjustment so that demo can be performed in future. We delete the start date present in the network and change the finish date to 90 days in future.
Step3: Perform Production Planning Run to reschedule dummy planned orders for blocking capacities(APO)
- In this step, Planning is done to look at activities to identify material requirements. Planned orders are modified to account for the new dates of the project.
Step4: Check the situation in the planning board and delete orders from previous demos, if required (APO)
- This step is done to delete orders that will affect capacity on machines being used for our planned orders, those that would use the same machine over the same period of time.
I'm facing trouble in this step. This step tells to go to the 'Detailed Scheduling Planning Board - Variable View' and select a given profile saved as a variant. When I execute the same, I do not see any planned orders attached to my project wherein the demo step mentions that there would be 3 planned orders and these should be adjusted to meet the capacity overload.
It would be really great if you can give some hints as to why I'm unable to see the desired results as mentioned in the demo script.
Regards,
Mazdul