Dear All,
I entered PIR for materiel-A 60,000 qunat. using t code MD61.
After MRP run i view the capacity over load using CM05 .
In CM05 i found capacity overload for my work center .All requirement assign into the first week and overload becomes 999%.In same work center for sub sequent week where capacity is available that capacity not utilized .So how can i flow my requirement to the next week and reduce my capacity over load.