Skip to Content
0
Former Member
Mar 02, 2009 at 10:09 AM

Add BP into existing call list

15 Views

Hi All!

I have created a call list with CRMD_CALL_LIST transaction containing the BP scheduled in the transaction BP.

Is It possible to add in this call list, a new BP, which takes its scheduling by the BP transaction?

I tried in CRMD_TM_CLDIST transaction to add to the list the BP, but it does not maintain the scheduling that I have entered in the transaction BP, the execution control fields are empty.

Is it possible to do this, or do I have to create a new call list?

Best regards

Virginia