issue with cost center

102 Views

Hi GURU'S

The requirement is for a cost centre to transfer from one node to another effective from the start of the new financial year. I have created a new cost centre for the required new period but get the following message when trying to change the hierarchy area for the cost centre.

Change range must cover complete existence period

Message no. KS042

Diagnosis

Field Hierarchy Area to be changed must be unique for the entire interval. You selected a change interval which does not include the entire period. Any change in the field would result in an inconsistency.

System Response

The SAP System rejects the entry.

Procedure

Select a suitable change interval with the function "Analysis period".

Any help?

rgds

Sunitha