Hi All,
Our Landscape consist of SAP 4.7 Enterprise Edition with Windows2003 on Oracle 10.2.0.2.0.
I have to take a system copy of production server to a new server and have to upgrade the new server to ECC6.0.
please let me know the procedure of taking system copy of 4.7 system, steps to be followed and the target server requirements.
Thanks
Edited by: Abdul Basheer on Mar 2, 2009 11:48 AM