Skip to Content
0
Former Member
Mar 02, 2009 at 06:23 AM

Inspection for second operation

38 Views

hi all

i have maintain inspection orgin 03 & 04 for sfg material in material master also in routing i have assign control key having inspection check box on for the 03 line item (0010,0020,0030).

my first operation shows perfect inspection lot after production order release. but when i go for the second operation it does not works and it show no inspection characterstics maintain for the operation, though i assign inspection characteristics to the operations.