cancel
Showing results for 
Search instead for 
Did you mean: 

PTM error

Former Member
0 Kudos

Gurus

Did configrations for and while creating IT 2001getting the below error.

''Not enough quota for attendance/absence SSSS on 05.04.2008 for personnel no. 01000130''

Could you please help me in this?

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi.

I think problem lies in the node

Determine Validity and Deduction Periods

Pls have a look at this node

Former Member
0 Kudos

Sikindar

IS DWSR means daily work schedule rule? If yes I have created daily work schedule for Working and Off and assigned in Period work schedule.

What is DATE ?

Devi,

In V_T551c I have given counting class1, I did the live run only

Ram

In V_T559D I have given the validity period.

Is there any other sugesstions, please...

sikindar_a
Active Contributor
0 Kudos

Check

ur DWS Grping

Holiday calendar

PWS rule

DWS

and DWSR along with their Grpings and Date

and generate the DWSR through PT01

Check and let me know....................

Former Member
0 Kudos

Hi all,

The issue is solved.

Now i want to use PT60 for this, could you please guide me in this.(What are the changes in the configrations to be done?)

Edited by: kumar.Durai on Mar 2, 2009 11:19 AM

Former Member
0 Kudos

Hi,

If you want to use PT60, ie quota generation in time evaluation, all the configuratins for the quotas remain same.

Just go to table V_556A_B and set the radio button to 'Increase' mode for your quotas and run time evaluation.

Sashi

Former Member
0 Kudos

.

Edited by: kumar.Durai on Mar 9, 2009 5:42 AM

Former Member
0 Kudos

Hi,

Check whether IT2006 records are available for that quota type in that period.

If it not there data in It2006, then do live run for time evaluation. After live run for time evaluation, quotas will be updated to IT2006. Then apply for the leave.

Good luck

Devi

Former Member
0 Kudos

Devi,

Ran RPTQTA00 and updated IT2006 with an absence quota from 01.04.2008 to 31.03.2009.

but while creating IT2001 a message is comming ''Generate period work schedule SSSSSSSS for 2/SS/01in 05/2008'' after pressing enter

same error is comming Not enough quota for attendance/absence SSSS on 01.05.2008 for personnel no. 01000130 Message no. HRTIM00REC014

Edited by: kumar.Durai on Mar 2, 2009 6:43 AM

sikindar_a
Active Contributor
0 Kudos

''Generate period work schedule SSSSSSSS for 2/SS/01in 05/2008''

here 2 is ur ESG

ss is ur Holiday Calendar

o1 is ur DWS Groping

where is DWSR

Check the PWS and check the DATEs and Groupings

Former Member
0 Kudos

Hi,

Here problem is work schedule rule and period work schedule valuation V_T551c.

Have you assign period work schedule to your counting class in the above table.

Check the work schedule configuration groupings, and absence configurations.

And you are generating without time evaluation, do the live run also.

Good luck

devi

Former Member
0 Kudos

Check whether IT2006 records are available for that quota type in that period(the period in which u r creating IT2001 records).

Former Member
0 Kudos

Hi,

I have created 2006 from 01.04.2008 t 31.03.2009 with 15Days of quota.

Creating 4 days of absence from 02.04.2008 to 07.04.2008

Former Member
0 Kudos

Check the It2006 whether in this infotype quotas are maintained