I have material having bom & routing both. Routing consist of 2 Operation 0010 & 0020 respectively.
and BOM consist of three componenets 2 is related to Operation 0010 & 1 with Operation 0020.
But when creating production orders all 3 components are assigned with Operation 0010. How can I changed Operation Assignement of Materials at BOM level. I have found Operation Assignment in Extras and check mark the operations & save the bom. But its not working. Whats the actual Problem?
Can any1 tell me?