Skip to Content
author's profile photo Former Member
Former Member

Variant configuration with Sales order?

Dear SAPIENTS,

I require variant configuration scenario in case of sales order, batch mangement, MRP, production order.

Regards,

Kaushal Rai

Edited by: Kaushal Rai on Feb 27, 2009 2:06 PM

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    Posted on Feb 27, 2009 at 12:13 PM

    Hi Kaushal..

    ur question is a bit not clear....

    See u use variant configuration when there are lot of possible combinations/variants.. u don't need to create material for each and every combination..u just create one configurable material which encompasses all the variant combinations with the help of characteristics and there value...

    When u create sales order then a configuration screen appears where u assign the desired values to material characteristics defined. Corresponding materials and operations get picked from the Super BOM and Super Routing. Material is checked for availabilty with those particular chars. If not available then during MRP the Planned order will be generated and which in turn converted to production order...Then u do the GR and delivery to sales order is done...

    this is the cycle...

    If you need to know to how to configure the variant configuration then let me know.. even there are many postes related to that...

    Let me know if ur doubt gets cleared to some extent.... Gurus let me know if i am wrong in explaining him..

    Neeraj

    Edited by: NEERAJ BHARDWAJ on Feb 27, 2009 1:14 PM

    Add a comment
    10|10000 characters needed characters exceeded

    • Dear,

      Follow these steps.

      1. Create the Characteristics in CT04.

      2. Create the Class in CL02. (Class type 300)

      3. Assign the characteristics to the above created class.

      4. Create the material (Product) in MM01 with material type KMAT.

      5. Assign the Class created in Step 2 to Classification view of Material.

      6. Create the configuration Profile in CU41. to the necessary setting to in it.

      7. Write the dependencies (Precondition, sele, procedure) in CU01.and Create Dependency net in CU21.

      8. Assign sele, procedure, Dependency net in Configuration Profile.

      9. Assign Preconditons to Chracteristics or Char values in Class.

      10. Check the model in CU50. whether your depencies or working file or not.

      11. Create the Supr BOM and Super Routing and attach the dependences in the respective and check whether your bom components and required operations are picking or not in CU50.

      12. VK11 - Enter VA00 (Condition) For Std RVA001 Pricing Procedure.

      Please refer this thread,

      variant-configuration

      http://www.sap-img.com/sap-sd/steps-for-sd-variant-configuration.htm

      Regards,

      R.Brahmankar

  • author's profile photo Former Member
    Former Member
    Posted on Feb 27, 2009 at 11:33 AM

    you will have to create scenario

    create characteristics, assign values.

    define in characteristic in class 300

    configure fert material

    check basic data configurable material tick

    create super bom assign dependencies for selections

    create super routing assign dependencies for selections.

    then create so

    sanket d

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.