cancel
Showing results for 
Search instead for 
Did you mean: 

Vertex

Former Member
0 Kudos

Hi,

We are using SAP 4.6 C currently. We are upgradingto ECC 6.0. Assuming the requirements remain the same what work is required in the new ECC 6.0 system to interface it with vertex? I mean what config. steps would we need to consider and are there any interfaces that need to be re-written in SAP during this upgrade.

Any help willbe apeciated.

Thanks,

ALAM.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

hi

only you have to check the conectivity between the interface and SAP.