Costing sheet mass update for Activities using CNMASS

Hi,

Is it possible to do a mass update for the costing sheet field in multiple activities? We tried to use tcode CNMASS but we weren't able to find the costing sheet in the Activities tab as a valid selection criteria. Is there a way to make this field available in CNMASS? We have around 10,000 activities whose Costing Sheet needs to be changed. We want to know if the project master data update should be done somewhere else. CATT script is another option that we're looking at but it looks very complicated right now.

Thanks a lot!

Joey

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

4 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Feb 25, 2009 at 06:59 AM

    Hi,

    In my opinion, WBS costing sheet will be given preference during overhead calc over costing sheet at network activity. So try changing WBS costing sheet by mass chnage, test run overhead calc to validate.

    Regards

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 25, 2009 at 08:14 AM

    Hello Joey

    CNMASS does not have the field and there are easier ways of doing this than trying to add the field to the program

    In your case:

    If you have ABAP help

    1) Easiest way is to record the transaction in SHDB and run them in background for all the 10000 activities.

    2) Or as suggested above use that BAPI or BAPI_PROJECT_MAINTAIN to correct the activities.

    If you do not have ABAP help

    The catt scripts will be the easiest option. Half an hour tinkering with catt can be useful to you in many ways.

    Regards

    Renjith

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Feb 25, 2009 at 08:43 AM

    have you tried LSMW?

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 26, 2009 at 12:04 AM

    Hi Everyone,

    Thanks for the responses. We decided to create a custom program instead to accommodate the requirement. Apparently, there is really no way to modify the Costing Sheet of the Network Activities using CNMASS.

    Thanks and regards,

    Joey

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.