Hi All ,
Please suggest me to workout for the below situation .
I have SLOC1,SLOC2,SLOC3,SLOC4 storage locations in the plant 1000. I want to check the SLOC1,SLOC2 stor locations only for the dependant complenents when I create a STPO in plant 1200 for header material(When creating STPO ,ATP carried out and checks for all components available in 1000 Plant) .And if I create Process order for the Header material , it needs to check the SLOC3 for the components availability .How can I map this one .Can it be possible with MRP area or any other solution is there ?
Thanks
Anil