Partial Cancellation of Material Document.

Hi all....

My client is having one requirement, we have project system & user wanted to return material from site to project stock, for eg. 10 quantity of material is issued to the user for internal consumption with 221Q, after one month user consume only 5 quantity of material and remaining will rerun to the stock which he no longer required. How to handle such returns?

We are trying this with MIGO (transaction type Good Receipt with reference to Material Document with which the material is issued and Mov. Type 222Q, here system display all the data of reference material document. But it allow to change the quantity even more than the quantity issued. This is serious issue.

Please help out......

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Feb 25, 2009 at 04:59 AM

    Hi,

    After Entering the quantity please click on Check button and see how the system is behaving.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.