We have defined a cost component group for each of the cost component in the system. This was done so that we could run a report where all the cost components can be displayed as columns and material displayed as rows. We run report S_P99_41000111 for that purpose.
I want to know if there a way for us to change the BASE of the report. Currently it is based on costing lot size. We want our standard for each unit.
So lets say if costing lot size is 100 and the standard cost for component Raw material is 1000 than $10(standard price/unit) is what we would like to see.
Is there a way to change the base in the report.
Is there some other report that would igore costing lot size and give us stndards / unit for all the components.
thanks
Nik