Hi Gurus,
We have maintained 01 inspection type for externally procured materials.At the time of each GR inspection lot gets generated.But the lot number is skipped by one number.For eg. at first GR the lot no. is 1 & for next GR the lot no. is 3. Why the system is skipping the number.
Regards
Amit