Former Member
Feb 24, 2009 at 10:15 AM

availability check

34 Views

i make sales order with material x and quantity 1 when i make avilability check i didn't get confirmed quantity at the requested delivery date although there's 100 pc from material x in storage location.

the system propose delivery date after requseted delivery date by 9 days

i checked the configuration of shipping point and make

pick time from 1 to 0

loading time from 1 to 0

when i make sales order with same material and the same quantity of above sales order. the system propose delivery date after requested delivery date by 7 days

the RLT is not activated on checking scope

can any one tell me from where dose the system get the appended 7 days?

thanks in advance.