i make sales order with material x and quantity 1 when i make avilability check i didn't get confirmed quantity at the requested delivery date although there's 100 pc from material x in storage location.
the system propose delivery date after requseted delivery date by 9 days
i checked the configuration of shipping point and make
pick time from 1 to 0
loading time from 1 to 0
when i make sales order with same material and the same quantity of above sales order. the system propose delivery date after requested delivery date by 7 days
the RLT is not activated on checking scope
can any one tell me from where dose the system get the appended 7 days?
thanks in advance.