availability check

i make sales order with material x and quantity 1 when i make avilability check i didn't get confirmed quantity at the requested delivery date although there's 100 pc from material x in storage location.

the system propose delivery date after requseted delivery date by 9 days

i checked the configuration of shipping point and make

pick time from 1 to 0

loading time from 1 to 0

when i make sales order with same material and the same quantity of above sales order. the system propose delivery date after requested delivery date by 7 days

the RLT is not activated on checking scope

can any one tell me from where dose the system get the appended 7 days?

thanks in advance.

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Best Answer
    Posted on Feb 24, 2009 at 10:35 AM

    Check in VOV8 whether any value is maintained for the field Lead time in days. Then check in your material master MRP2 view for the two fields In-house production and GR Processing Time

    thanks

    G. Lakshmipathi

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      thanks Lakshmipathi your answer solve my problem.

      and thanks all for your efforts but i have a comment on the answer of checking lead time in sales document type

      lead time in sales document type to retrive required delivery date.

      Regards;

      Mohammad mansour

      Edited by: mohammad mansour on Feb 24, 2009 3:54 PM

  • author's profile photo Former Member
    Former Member
    Posted on Feb 24, 2009 at 10:19 AM

    Hi mohammad,

    I think below link will be useful for you in order to find solution.

    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/SDBFAC/SDBFAC.pdf

    Gothrough it,

    Thanks,

    Swamy H P

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 24, 2009 at 10:26 AM

    Hi,

    Check In VOV8 the lead time defined for delivery, and check the factory calendar settings

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 24, 2009 at 10:27 AM

    Hi,

    Please check the lead time in days field in Tcode VOV8 for your order type. It must be & days. Make it blank

    Your problem will solve.

    Regards,

    Abhee.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.