Skip to Content
0
Former Member
Feb 24, 2009 at 05:24 AM

Router Component allocation are deleted when there is a change to the BOM

453 Views

Hi Everyone-

Does anyone know how or if SAP has a way to not delete component allocations within a router whenever a BOM is changed?

For example:

BOM for material ABCD

component changed from 1234 to 6789

Component 1234 was assigned in the router for ABCD to operation 0050. However, once the BOM is changed to 6789 the component becomes unassigned to the first operation of the router for ABCD.

The users do not wish to change the Router everytime the BOM is changed.

In a perfect world the user wants the system to assign component 6789 to the same operation as component 1234 was assigned to in the router.