Hello,

I am creating a quota arrangement for a material and assigning a source as A and B vendors.

but when i try to make the PR and trying to assign the source it is taking some contract into consideration.Also when i am trying to assign my source to it, why its not taking quotarrangement into it, and while changing giving message as "Vendor XYZ is already assigned as fixed vendor"

But when i saw contract, sourcelist no such tick is available.

Please suggest how should i go forward??

Thanks & Regards

P.S.P

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Feb 23, 2009 at 09:34 AM

    HI,

    Check in Info record / Source list wheather u have fixed that vendor.

    Regards

    Mahesh M J

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 23, 2009 at 09:37 AM

    Hi,

    This is because you have selected the Fixed vendor check box in Source list for this material.

    Please check the source list in ME01.

    Regards,

    Manish

    Add a comment
    10|10000 characters needed characters exceeded

    • I am sorry to say, but its not having tick for "Fix" in the source list. Also i have checked for the source list LIST, whether any other is also maintained or not. but no other is available.

      Also, when i see the sources tab inthe PO, it shows the contract number, but in contract i didnt found any such indicator.

      PLEASE SUGGEST M WAITING FOR YOUR FEEDBACKS.

      Edited by: P.S.P on Feb 23, 2009 10:49 AM

  • author's profile photo Former Member
    Former Member
    Posted on Feb 23, 2009 at 10:16 AM

    Hi,

    Please clarify me with reference to which vendor the contract is raised.

    If it is raised with reference to vendor XYZ system will pick it as fixed vendor while determining the source.

    Regards,

    Bharat.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 23, 2009 at 11:04 AM

    Hi,

    If you have created a contract for the material in question, then system picks that contract as valid & fix source for the material & in that case, other sources will not be taken into consideration. You can check this by blocking the item in the contract.

    Regards,

    Prashant

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 23, 2009 at 11:21 AM

    Hi,

    Quota arrangement is taken into account at the time of auto-generation of PR.

    If you create PR manually,quota arrangement is ignored.

    Brgds,

    Ashok

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.