activity scheduling

26 Views

we have an operation for which the time taken by the machine is 1 hr.A labor also works simultaneously on the machine, that is for the same 1 hour.He works along with the machine.There is a cost involved for the machine running hrs and labor hrs.In the rate routing do I need to take for the base qty, two standard value paramters and values as 1 hr machine time and the other 1 hr labor time.Scheduling to be done for machine only as both are working simultaneously?