Hi everyone,
Currently my interface is posting MIGO movement type 201 (Goods Issue with ref to Cost Centre).Stock in SLOC will decrese. Then my program will use BAPI (BAPI_KANBANCC_WITHDRAWQUANTITY) to update the qty in the KANBAN to reduce the qty. I'm using 9011 replenishment strategy with Reservation. Once KANBIN bin is EMPTY and the FULL button is clicked, a Reservation will be created for fulfillment.
Now there is a new requirement to cater for 202 movement. Interface will post the 202 movement via the Gooods Movement Create BAPI. Stock in SLOC will increase.
Question :
For the KANBAN portion, which KANBAN BAPI or function can I use to increase the qty in the KANBAN bin to be in line with the 202 movement at the IM level?
Eg if there is a 202 movement of 2 qty in the SLOC, the KANBAN bin will need to be increase by 2 qty as well.
Thanks in advance
LIM
Singapore