Dear PP Gurus,
Clients requirement is that they want yield range at every operation.
eg: to make a tablet following 5 stages :
1) Granulation
2) Lubricated granules
3) Compression( core tablet)
4) Coating (coated tablet)
5) Sorting.
now the question is in granulation while doing the confirmation they can put yield as +5% and -5%.
so they have bsize 100 kg output is 95 to 105
now when they do second confirmation they want limit of +2% to -2% of previous confirmation.
same way it continues, different % range is maintained for different operation.
how to do this. please guide
thanks
kailash thakkar