Skip to Content
avatar image
Former Member

wm to production supply issue

Hi gurus ,

My question is simple but i am not getting the answer . Pls guide me.

In our system Warehouse is not subjected to Production.

Only packaging is done for the material & material despatch takes place.

In short work flow is.

TR >TO >Packaging -->TO confirm >TR( for dispach) >TO -->confirm TO

Now i want to cleare the concept for production plant.( with PP module & without PP module)

The material which are related to Bom I mean

the Mtrl(for e.g. A,B,C,D) which we supply to Procuction supply (100 st.type) will be processed which will now form single finished(for e.g. F) componant. this mtrl now we want to Put in Final storage bin (from 100).

Now my point is how the system will treate in WM point of view i.e. we know the material A,B,C,D is present in the 100 st. type & Finished componant F is not present in st type 100??

pls.guide me.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    avatar image
    Former Member
    Feb 21, 2009 at 04:49 PM

    A possible process might be (there are other scenarios):

    1. Create PrdOrd (directly or from planned order; CO02, MD04, CO40, CO41)

    2. Release PrdOrd (e.g CO02) > TR is created for material staging

    3. Process the TR from LB10: you get the TO and the pick-parts will ge into storage type 100 + dynamic bin.

    4. Confirmation (e.g. C011N, CO15):

    - you get the FG by IM-mvt 101, it will appear in storage type 901 in standard system

    - components will be consumed from 100 + dynamic bin

    5. In LB10 you can process the TR that was created as a consequence of IM-mvt 101 and getting the TO you put away the FG.

    (As I mentioned, this is only one possible scenario)

    Regards,

    Csaba

    Add comment
    10|10000 characters needed characters exceeded