Hello,
I have manually created Planned ind requirements (Forecasts type FA) in APO SNP.
Those PIRs don't exist in ECC. I have created an integration model in ECC for PIRs.
When executing the CIF delta report CCR, the reports shows one error for PIRs which are in APO but not in ECC (which is what I expected so far)
The text msg is "Missing in R/3 with external Key" and the error code is 311 "APO order does not exist in SAP R/3 for product X Location XX"
However I am not able to click the push button "Send to R/3". The only push button available is the "APO trash" to delete the PIRs in APO.
Do you have any idea how to force the PIRs into R/3, i.e. how to unblock this R/3 push button?
Thanks in advance for your help, it would be very appreciated.