Hello,
My client wants to take costing run through CK11n.
Now for the final product, a raw material is used.
This raw material has a follow-on material in material master.
This raw material is for free and so the client does not want to conisder it while costing the end product.
Previosuly this issue was resolved by removing "Costing Relevancy" tick in the component details of production order.
For this particular material, I tried to remove the costing relevancy tick of the main raw material, which i could do, but the tick for follow on material could not be removed as its a greyed out field.
Can anybody tell me the reason which the "costing relevacny" field is greyed out and how can i change it.
Thanks,
Ankita