Dear Experts,
We have case where in One Wooden Case ,2 Engines Need to be Packed.
The Packing Material is added in the BOM of Engine Assembly.
When Running MRP for Engine Assembly ,System is considering One Packing Material for one Engine Assembly.
How do I Configure the Unit of Measure in such case so consumption of Packing Material is not doubled ?
Regrds,
Siddarth