Dear All
I have 3 Boms
in which a unique material is present
for the first BOM when i have runned MRP a requisition been raised for 300EA on 12.12.2008
for the second BOM when I have runned MRP on the same day the system raised another requisition for 250Ea on 19.12.2008.
for the third BOM when I have runned MRP on the same day system raise a prs with 200EA on 18.12.2008
is it not possible with MRP to raise an single PRS in the month with required date as 12.12.2008 and qty 750EA cummilatively.
If so Kindly let me know the Configuration.
Regards
Chaitanya