Dear Experts,
We have one material QMMAT for which we maintained inspection interval as 180 days .The initial GR date for the material is 05/03/2008. The material is sold and returned back from customer on 16/02/2009 for which inspection lot with inspection type 05 created on 16/02/2009 and UD done on the same date .
Now the the next inspection date based on inspection interval maintained in material master will be 16/08/2009 . But when running QA07 on 16/02/2009 this material QMMAT also considered and again one inspection lot with inspection type 09 created on 16/08/2009 ( which should not happen as the next inspection date should be 16/08/2009).
Now we have made the usage decision on 16/02/209 and now the next inspection date 16/08/2009 . When we ran QA07 system is not creating any inspection lot this time. We dont know why system created an inspection lot again unnecessary second time after UD for customer return lot done . Please help .
Thanks.