Currently, as per the standard SAP functionality, whenever a goods issue of the component is posted to the sub-contractor/vendor, the stock is immediately reflected at the subcontractor locaton in SAP S4. This however would not be the case in real time where, the stock is shipped overseas over a period of multiple days to reach the vendor location. Now i need to implement enhancement to change goods movement type to SC In Transfer until the goods reaches subcontractor and change it back into stock available once it reaches sub contractor.
I am maintaining a custom table with transit time between ordering plant and sub-contractor. Can anyone tell me any available enhancements for this.I am new to enhancements.