Hi All
I want to use pegging functionality. In my scenario i am usin one top level project and other projects are linked with that project through subnetworks. Procurement takes place at top level WBSe and then material move from top level to the 5th level WBSe in other lower levl project.
How can i use Pegging in my scenario.