Skip to Content
0
Former Member
Feb 18, 2009 at 11:05 AM

Material Master

45 Views

This is requirement for material master related

I have some advice for material master, in old material master created time price control S or V.

Now I have checked the material it is wrong selected a price control, so i would like to change S to V and V to S.

1. How to change price control type S to V and V to S. ?

2. If I can change material then which type of entry generated and which ledger effected ?

provided full details with flow chart

Thanks