Hi,

My finished product cost is 518 and i ran the standard cost estimate also.

In that 500 is raw material cost and 18 are material overhead.

I created the production order in co01 with 10 quantities and i have only one operation.

in CO11 i confirmed only 5 quantities and i didn't eneted any activities there.

here it is WIP Showing 5000 instead of 2500.

Here the system should show 2500.

Please guide me where i have the missed the configuration.