Hi experts,
I am working on a variable size Item scenario, I am unable solve this one.Please solve the same.
Raw material : Sheet2Nos. 6m*3 m that is18 meter square(terms of payment to vendor is Tons)
requirement 1: 3m*2m=6 meter square(GI for production order in mm)
then remaining Raw material = 18 - 6=12 square meter
requirement 2: 6m*2m=12square meter
eventhough the area is sufficient from remaining raw material from sheet 1(12meter square ) dimension is not suitable for the requirement 2.
My requirement is when I enter the requirement 2 system should issue the sheet No.2
How to restrict this?
Thanks and Regards,
S