Hi All,
I have confirmed the material for final confirmation before past 4 days, in that all the materials are moved to the quality inspection. mean while it generate one matrial document. and afterwards i clear the quality inspection and move the material to final product stor location. that time also it create a material document.
Now i need to know that, how can i reverse the confirmation. what material document what i used.
pls reply with ur answer
VBakyaraj