Hi,
Mine forecast is not getting transfered.
Maintain the distribution setting in APO with Logical system and Plant along with PIR.
Created activity,transfer profile run the schedule job
Material and plant already in place at APO System.
Checked the log book
check the spool of the batch job it says material in plant is not planned
where as in case of other material its shown as SUCCESSFUL transfered to R/3 in the spool then also its PIR is not getting reflected in MD63
Weather the material and location has to be assigned to Active model in APO Master data?