Forecast not getting transfered to ECC as PIR

200 Views

Hi,

Mine forecast is not getting transfered.

Maintain the distribution setting in APO with Logical system and Plant along with PIR.

Created activity,transfer profile run the schedule job

Material and plant already in place at APO System.

Checked the log book

check the spool of the batch job it says material in plant is not planned

where as in case of other material its shown as SUCCESSFUL transfered to R/3 in the spool then also its PIR is not getting reflected in MD63

Weather the material and location has to be assigned to Active model in APO Master data?