Dear All,
During production confimation with backflush control, it is allowing to confirm more than the stock available for the component. For eg. to produce 10 Ea of a material A we need 10 Ea of material B(1:1 ratio in BOM), but the stock is available only for 7 Ea, still the system allows confirmation for 10 Ea of material A. Necessary settings is done in OPK4, kindly suggest how to control the same.
Thanks in advance,
Jagadeesh.