Feb 16, 2009 at 12:10 PM

Confirmation with backflush

41 Views

Dear All,

During production confimation with backflush control, it is allowing to confirm more than the stock available for the component. For eg. to produce 10 Ea of a material A we need 10 Ea of material B(1:1 ratio in BOM), but the stock is available only for 7 Ea, still the system allows confirmation for 10 Ea of material A. Necessary settings is done in OPK4, kindly suggest how to control the same.

Thanks in advance,

Jagadeesh.