How to do and is there any way to update the VPRS cost condition whenever vendor sends confirmation of material and cost after purchase order.
After receiving the confirmation form the vendor,the VPRS cost condition should get updated in the system automatically.
We have one cost condition type ZVPR which is same and consists of same properties of VPRS. How to update this ZVPR condition from VPRS Condition.
Thanks in advance....
Regards....Venkat
Edited by: venkat t on Feb 16, 2009 11:57 AM
Not resolved and it is in process
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
VPRS is calculated from material master cost. Are you going to change your material cost once you are receiving PO confirmation and cost from vendor, if so you can assign one requirement to VPRS, once your PO is confirmed, then determined VPRS cost and that time whatever price will be in your material master that will be copied to your pricing.
To update ZVPR from VPRS, you can assign from step as VPRS cond type and can assign alt con base value to ZVPR cond type where you need to maintain KOMV-KBETR as 100000 i.e. 100%. ZVPR will just have same value as VPRS.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
8 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.