Dear all,
I have a scenario like this -
I have a project operating in two plants and made a project structure in Plant A.
I want to do manufacturing of FG in Plant A. Then I want to send that FG to Plant B through stock Transfer order (STPO / STPR). Then I want to deliver (CNS0) the FG from Plant B to customer.
For that I have made WBS 1 for Plant A where I made an activities for the manufacturing and the delivery of material.
Then I made WBS 2 for Plant B and added an activity for delivery of FG.
I want to know wheather I have done the correct project structure for above stated requirement. If not how to process this requirement?
The problem we face is that the profit centre is not getting changed when material is transfered by STO.
Pl reply ASAP.
Thanks and Regards,
Parimal