Hi
The problem I have is as follows:
I'm into flexible planning and I've done all the required configuration for mass transferring the data from the planning table to the demand management. I'm able to mass process (transfer data) from the material level to the demand management, but when it comes to the transferring data from the detail level(SKU), the transfer does not happen. The planning heirarchy is - company code>prod line>group>plant>Material>SKU(FERT).
I'm able to transfer data through mass transfering and manually(MC94) at the 'Material' level but when I try to do the same at the SKU level - manually, the system picks up the 'Material' and not the SKU and in mass processing, the job is successful as per SM37, but at MD63 the SKU material does not have data - the error message is 'No requirements were found which correspond to the selection criteria'.
Any suggestions or ideas are most welcome and greatly appreciated.
thanks
BE