PS-SD integration is it possible to create a Whole WBS Structure

448 Views

Hello to everybody,

I'm involved in project in which there is a strict integration SD-PS. Each sales order item should be assigned to a specific WBS element. I found SD/PS assignment indicator, in control data of standard project definition. i customized the coding mask to create an operative project after sales order saving which code is a suffix concatenate to sales order number. example if sales order number is 290 the project will be E-270. Unfortunately the WBS elements don't change. So the first level of WBS (the billing element) and second levels (account levels) mantain the code of standard WBS. I wish that also their operative code could be automatically determined.

In the previuos example I wish the project coming out so structured

E-270 (project)

E-270 (aggregating first level)

E-270-0010 (second level related to sales order item 0010)

and so on...

Is it possible by standard. actually I tried but first and second levels are proposed as in standard project so I have to manually change them by replacing...

Thank's in advance

Luca Pastura