02-13-2009 7:15 AM
Hi
In upgradationthe Data migration from 4,6b to ECC 6.0 is aitomatically happen or we have to down load in 4.6b and then upload manually in ECC 6.0.
How to do this.
Thanks
Anto
02-13-2009 8:59 AM
Hello,
No Need that automatically directly it will update.....
Thank u,
santhosh
02-13-2009 8:54 AM
Hi,
Through SPDD and SPAU Transactions we can do the upload from one server to another server.
Regards,
Anki Reddy
02-13-2009 8:59 AM
Hello,
No Need that automatically directly it will update.....
Thank u,
santhosh
02-13-2009 9:00 AM
Hi,
we can upload the data using programs.or using Database link we can upload the data.but not using spdd spau transactions.
Thanks
durga.K
02-13-2009 9:03 AM
Hi,
We have N number of ways.. like
1 .You can use the BAPI method to extract the data from SAP 4.6 and upload into SAP ECC..
2. you can create a BDC program to upload the data into ECC.
3. you can use the third party tools to doo.. soo..
regards
Md.MahaboobKhan
02-13-2009 9:07 AM
Hi,
Sorry for the above answer,
1.Using ALE/Idoc we can migrate the data from 4.6b to ECC 6.0.
2.We can download the data from 4.6b using Download program or other techniques like BAPI or BDC and upload the same to ECC 6.0 using the program's.
Regards,
Anki Reddy N
03-19-2009 9:55 AM
n Technical SAP,Upgrade from 4.6 to 6.0- the role of any fucntional consultant would involved integrated with the technical Consultant.
The phase starts with the technical Patches apply to the latest stack level which will done by the BASIS Consultants.
Once the System preparation is happened, the next phase is with SPDD phase, Thru this transaction the dictionary Objects-Database elements, database tables and structures of teh latest system can be
compared with the old system.
This results in the version modification results between the old and New versions. During this phase the involvement of the Functional Consultant needed for the tech guy, to identify the functional chnages between the two version (Old and New). Which helps for him either to Reset to Original(ie., adopting the new one) or Adopt Modification in previous system(ie., adopting to older functionality)
Once this is done, the System Upgradation will be done by the BASIS, the system will be replaced with new system. At teh end of this phase SPAU phase starts, which inturn reults with version difference in the field namely, Programs, Reports, Screens, Messages, Notes an Function Modules. Here too the involvement of functional consultant neede to determine either reset to original or to go with Adopt modification from the older design, as explained earlier.
At teh end of the, moreover the functional consultant role involved in testing the Entire processes and transactoin in the system for system dump and bugs, in necessity to correct teh same and results with nil errors in production client.
Also the Zprograms invloved in the older versions, needs to be examined for the actual need, and to be justified with adoption in the newer version or by adopting to the updated functionality in the newer version.
Hope this may give better clarity in the involvement of the Functional Consultant in the Updgrade project.
Thanks
Manish