Freight charges cannot be changed in PO

Hi Masters

I have created a import PO for a vendor X and freight charges in PO for the vendor Y for about 14000 JPY. MIGO and MIRO(delivery costs) has been done later.After that it is found that the freight charges is wrongly mentioned in the PO.The actual freight cost is 1300 JPY.

So I cancelled the MIGO document and MIRO document to change the freight charge in PO.Although I have cancelled the both i cannot change the Freight charge in the PO.

How to solve this?

Regards

Mohan

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

5 Answers

  • Best Answer
    avatar image
    Former Member
    Feb 13, 2009 at 10:29 AM

    Refer the OSS Note :: 457511

    Is it possible to change or add delivery costs in the purchase order after a goods receipt has been executed?

    Answer:

    No, this should not be possible. The system generates error message V1631 'You cannot enter new delivery costs' (V1631). Important: If your system does not behave in the manner described, this is an error that can be corrected using Notes 187694 and 196884. This affects the earlier Support Packages of Release 31I, 40B, 45B and 46B (you will find more detailed information in the two notes mentioned).

    For the changeability of delivery costs after an invoice receipt, see Note 651798 and Note 720191, or Note 549408.

    The existence of held delivery cost invoice documents must be checked manually and has to be considered.

    Delivery costs must not be entered again or changed if all follow-on documents were cancelled for the purchase order item, unless there were no delivery costs for the posted documents. Otherwise there is no guarantee that continued processing will run without errors.

    If you change the Customizing for existing delivery costs, the system does not read this either in a purchase order with an existing goods receipt. The new Customizing settings only take effect when you create a new purchase order.

    Of course, the condition values of time-dependent conditions can still be changed even after a goods receipt has occurred. See question four for information on how to change the master condition values.

    Please note:

    The restrictions on changing delivery costs as described above have only been developed over time. This is not due to changed functions, rather previously we did not know that making changes could sometimes lead to subsequent irreparable errors.

    In particular, when you post invoices for delivery costs, the logic considers delivery costs that have already been posted (even if they have since been cancelled) AND the data for delivery costs from the database (as displayed in the purchase order). During processing, you have no way of knowing if this information is no longer compatible, nor any way to discover the cause, and this leads to incorrect processing.

    You should therefore proceed as follows:

    If delivery costs were entered incorrectly, you must cancel all related purchase order items (reverse all documents) and enter a new purchase order item with the correct delivery costs. Otherwise, there is no guarantee that further processing will be correct.

    If your delivery costs are changed regularly, you should use master conditions.

    Additional note:

    If you have manually changed or maintained conditions in the purchase order, under certain Customizing settings when you run a new price determination after a goods receipt, a condition may be determined twice. For more information, see Note 456691, question 26.

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Feb 12, 2009 at 01:46 PM

    Which movement u use for GR? and from which trx did you reverse Mat. doc.? Do youhave an inb. del for this PO?

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Feb 12, 2009 at 01:50 PM

    Do you have separate condition record maintained for this? How did you populate Freight charges initially in PO?

    Add comment
    10|10000 characters needed characters exceeded

    • Hi

      Once GRN has been done means you accepted the all incidental costs so you are not allowed to change delivery costs by any means. Even if you reverse also you are not able to. Instead you can try reducing condition value in MIRO through Edit conditions in item details or try reduction option for delivery costs.

      Thanks

  • avatar image
    Former Member
    Feb 13, 2009 at 05:52 AM

    Hi,

    I think you can't make any changes in conditions after you do the MIGO.

    This is SAP standard functionality.

    Regards

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Feb 19, 2009 at 06:45 AM

    Hi Masters,

    Is it possible to have Release Strategy for PO based on the material type?

    Regards

    MOhan

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      No it is not possible,

      Please check the fields avaialble for PO release process in SE11>CEKKO.