on 02-09-2009 10:48 AM
Hi
Following is the Issue of Captive Consumption,
When I will move Finish Good material from finsih Good storage Location for internal use (to diff storage location) within plant,I have to pay Exicse Duty when i will move matrail and also want to take credit against the same.
How to map above issue
Regards
Hemant
Hi,
Option 1: ·
In the master data declare material X as Finished Goods
Donu2019t update RG1 for X after production.
If it is required for selling, then update RG1 (create a sloc FIN, when 311 happens to sloc FIN RG1 to be updated).
Ensure through SD configuration that material X is always picked from sloc FIN
By authorization control restrict the authorization to sloc FIN ·
For captive consumption move material X to production using 311(or 261) movement ( No updation of RG1)·
Option 2:· In the master data declare material X as Finished Goods
Update RG1 for sponge iron after production.
For captive consumption move the material X to production stores.
Update RG1 for Movement 311(or 261) to production store
Regards,
Krishna A S V
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
96 | |
10 | |
9 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.