Dear Friends
Inspection type is linked to task list usage in inspection plan
For inspection type 01 - task list usgae is 05
For inspection type 89 - task list usage is 03
my inspection plan is using usage 03 universal
when i create manually inspection lot 89 system can able to read my inspection plan
but where as inspection lot created by inspection type 01 sytem can assign the inspection plan automatically as my inspection plan is 03
how to solve this problem
meaning i want to have common inspeciton plan for all the inspection types
can i change usage as 3 to all inspection type
is it best way to configure
please advise
Thanks in advance
Regards
Raj