on 02-06-2009 6:23 AM
Hi,
If my incoterms in Sals order is Ex works i dont wanaa have Shipment / Costs doc. to be created.
Can this be done without any enhancements.
Rgds
Hi,
We've achieved this through the following:
We've created a separate route for ex-works shipments. These shipment are automatically planned through VT04 (with criteria the ex-works route) with a separate shipment type which is made shipment-costing irrelevant.
You can otherwise use BADI BADI_LE_SHIPMENT with interface IF_EX_BADI_LE_SHIPMENT and method AT_SAVE which allows you to change data during saving of the shipment. You can check on the incoterms and if neccesary uncheck the shipment costing relevant flag during saving.
MdZ
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.