Skip to Content
0
Former Member
Feb 06, 2009 at 03:48 AM

GR only if Inspection plan exists

98 Views

Dear Experts,

My requirement is to control lot creation without Inspection plan during GR generation for a material.

QM proc is active in Material master with require inspection type.

Phenemina: Without inspection plan the lots are generated during GR. I want to prevent this situation or detect the same during GR generation itself. Is it possible in Standard SAP or else?

VRMP.